Tracking environmental business and technology • If you've got a story, we want to hear it! • Email us at: showmethenews@greenbang.com

more » Carbon

Exxon tests waters of gassy carbon capture

burn.jpgWhat’s it like to have an angry Rockefeller on your back? Not a pleasant experience, Greenbang reckons, apart from the potentially ear-pleasing sounds of gold bullion dropping from his trouser pocket as you try to shake the blighter off.

One company who could describe the Rockefeller experience is Exxon Mobil, who recently got a slap-down from the family, which holds shares in the oil giant over lack of investment in renewables.

While there’s no word on the renewables front yet, Exxon is experimenting with clean tech in the form of carbon capture.

The company revealed this week that it’s ploughing $100 million into “development and testing of an improved natural gas treating technology” which could boost carbon capture.

Here’s more on the tech itself from Exxon:

The company plans to build a commercial demonstration plant near LaBarge, Wyoming, where it will use ExxonMobil’s Controlled Freeze ZoneTM technology, known as CFZTM. CFZTM is a single-step cryogenic separation process that freezes out and then melts the carbon dioxide and removes other components including hydrogen sulfide, which is found in so-called sour gas. If successful, the process will reduce the cost of carbon dioxide removal from produced natural gas. […]

Using the CFZ™ process, the carbon dioxide and other components are discharged as a high-pressure liquid stream for injection into underground storage or for use in reservoir management to enhance oil recovery. Besides reducing the cost of separation, transportation and reinjection, the CFZ™ process can eliminate the use of solvents, sulfur plants and carbon dioxide venting in processing of the natural gas.

The new demonstration plant will advance the CFZ™ technology to commercial application, and be located at ExxonMobil’s Shute Creek Treating Facility. It will process about 14 million cubic feet of gas per day for injection and test a wide range of gas compositions to evaluate the extent of its applicability to the world’s undeveloped gas resources.

Construction on the plant is scheduled to be finished next year, with two years of testing to follow.

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • Digg
  • del.icio.us
  • Netvouz
  • DZone
  • ThisNext
  • MisterWong
  • Wists
subscribe
Subscribe to Greenbang RSS Feed

Subscribe by RSS
Have an RSS reader? Keep up with Greenbang all day long.

The Greenbang Feed

Subscribe by Email
Sign up and recieve emails whenever Greenbang makes important updates.

Join now for free updates


comments
There are no comments yet.
leave a reply
Name (required)

Email (will not be published) (required)

Website (optional)

Your Reply:


 
what we’re about

Greenbang tracks the explosion of the environmental industry, reporting on news of green innovation and thought leadership.

We blog on this rather than the environmental problems of the world because we are interested in the answers to climate change.

submit story

If you've got a story, we want to hear it!

Email us at: showmethenews@greenbang.com