Whitepaper writing services from Greenbang - click here to find out more.
 
Home | Research Store | Work With Us | Events | Insight | Press | About | Newsletter | Contact

Innovative German biomass plant begins operations

Published Friday, 3rd July 2009

Biomasse-Heizkraftwerk in Böblingen - Hightech hinter SilberblecGermany has started operating a new biomass heating and power station that uses finely chopped material to generate eco-friendly energy.

The Zweckverband Restmuellheizkraftwerk Boeblingen (RBB) plant in Baden-Wuerttemberg completed successful trials this May.

Siemens’ Industry Solutions Division supplied a Reject Power system that enables the use of fuels with a high water content such as screenings from wood-chip processing. The new plant will be able to supply enough electricity to meet the needs of around 5,200 people. At the same time, the heat produced can be fed into the district heating network. Compared to the use of fossil fuels for the generation of electricity and heat, CO2 emissions are reduced by 10,200 metric tonnes per year.

The new power station supplements existing facilities for the thermal exploitation of residual materials. With the help of the Reject Power system for power generation, around 20,000 metric tonnes of finely chopped material that couldn’t otherwise be incinerated in conventional facilities can be utilised every year. The finely chopped material consists of natural-wood screenings that are produced when green waste, residual wood from forests and wood left over from landscape conservation, for example, are cut up into small chips.

“This facility is new territory for us,” said Wolf Eisenmann, managing director of RBB. “For the first time in Germany, we are producing electricity and heat from finely chopped material.”

The Reject Power system consists of the combustion chamber, the waste heat boiler, a flue gas cleaning unit and the chimney as well as the electrical equipment. The heart of the system is a spinning wheel, which throws the fine wood screenings into the combustion chamber at high speed, ensures better distribution of the combustion material and thus guarantees complete incineration. At a temperature of up to 950 degrees Celsius, the combustion chamber converts the screenings into usable energy. With the help of the spinning wheel method, fuels with a high water content can also be used.

The Reject Power installation is designed for the thermal conversion of around 20,000 metric tonnes of screenings, and produces 6.4 metric tonnes of steam per hour. A steam turbine uses the steam to generate electrical energy and provide heat for the district heating network. A power generator with an output of 700 kilowatts supplies the public grid of the community. The heat is fed into the district heating network via a district heat exchanger.

Due to the combination of power and heat that is produced, a fuel utilisation ratio of around 80 per cent is achieved.

Bookmark and share:
  • Twitter
  • Google Bookmarks
  • LinkedIn
  • Facebook
  • Reddit
  • StumbleUpon
  • Digg
  • Slashdot
  • del.icio.us
  • email
  • Print
  • PDF




Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.












RELATED NEWS

Latest Insight

Newest electric cars make hybrids green with envy thumbnail

Newest electric cars make hybrids green with envy

It’s a good sign when cars once considered among the “greenest” around find
Does energy efficiency matter? thumbnail

Does energy efficiency matter?

Just days on the job, Britain’s new Energy and Climate Change Secretary Edward
Heat dials up on smart-thermostat wars thumbnail

Heat dials up on smart-thermostat wars

Transform boring, old technology into something with next-generation smarts and huge market potential,

LATEST REPORTS
1

Who’s the leading smart-city brand?

More than half of the world’s nearly seven billion people now live in urban areas, and that proportion is expected to reach almost 69 per cent by 2050. To avoid pushing local and global systems to the point of collapse, cities will need to become much smarter and more efficient Read more ...
more info
2

Managing the smart-grid data overload

Developing the UK’s smart-grid infrastructure will require communications and data technologies that can manage far more information than utilities must handle today. That’s the focus of a strategy report from Greenbang Research: “Enabling the UK’s smart-grid future: The wireless spectrum debate.” The report answers such questions as: Should dedicated Read more ...
more info
3

Incentives fire up UK solar market

The introduction of the feed-in tariff (FIT) incentive policy on 1 April has sparked an explosive reaction in the UK renewable energy market with solar leading the way in installations, according to a new Greenbang research report titled, “The UK’s Feed-in Tariff: Impact, response and market trends for the decade Read more ...
more info